EV Charger Installation Templestowe Lower

Switchboard Assessment Included. Lifetime Workmanship Guarantee.

Bitz Electrical installs home and commercial EV chargers throughout Templestowe Lower, from the Yarra flats near Finns Reserve up to the Doncaster border. We also cover neighbouring Bulleen, Doncaster and Lower Plenty. Every installation includes a full switchboard assessment, a dedicated circuit and a compliant setup for all major vehicle brands, backed by a written quote before we start and a lifetime workmanship guarantee.

🏆Lifetime Workmanship Guarantee
Consistent 5-Star Google Rating
25+ Years Experience
🛡️Licensed & Insured
🔍Switchboard Assessment Included

Get a Free Quote

What The Locals Say

EV Charger Installation Templestowe Lower

Home EV Charger Installation

A dedicated AC wall charger draws from its own circuit, charges far faster than a standard outlet, and is built for the sustained overnight load an EV places on the system. We assess your property's electrical setup before recommending a charger and handle any switchboard work required as part of the same job.

What's Included in Every Quote

Before recommending a charger we assess your switchboard capacity, supply type and cable route. Templestowe Lower, or Lower Templestowe as most locals still call it, sits on smaller blocks than its neighbour to the north, with a lot of postwar and 1960s brick veneer between Manningham Road and the Yarra. Garages here are more often attached or built alongside the house, which usually means a shorter cable run. The trade-off is age: original ceramic fuse boards and early breaker panels without safety switch protection are common, and where a board has been added to over the decades it is frequently full. Where an upgrade is required, we include it in the written quote from the start, one job, one visit, no surprises.

Commercial EV Charger Installation in Templestowe Lower

Macedon Square and Macedon Plaza on Manningham Road anchor the suburb's retail and services, and the medical suites, offices and cafes along that strip are increasingly fitting customer and staff charging. We handle single and multi-bay commercial installations including load management planning for sites where multiple vehicles charge simultaneously.

Home EV Charging Speeds: What the Numbers Look Like

The difference between a standard power point and a dedicated wall charger is significant in practice. Here is how the three main options compare for a typical 70kWh battery:

Charging Method Output Charge Time (70kWh Battery)
Standard power point (10A) 2.4kW 24–30 hours
7kW Type 2 wall charger (single phase) 7kW 8–10 hours
22kW wall charger (three phase) 22kW 3–4 hours

Almost every home in Templestowe Lower runs single-phase supply, so a 7kW wall charger is the standard recommendation and will comfortably fill most batteries overnight. Three-phase is rare on the suburb's postwar and 1960s housing stock, and where a household wants 22kW charging the cost of bringing in a three-phase supply usually outweighs the benefit for a car that sits in the driveway all night anyway. We confirm your supply type as part of every assessment.

Switchboard Assessment Included With Every Quote

An EV charger draws a sustained high load and your switchboard needs to handle it safely. We assess yours as part of every quote at no charge, checking spare capacity, RCD compliance and cable route before recommending anything.

Templestowe Lower has some of the oldest switchboards we see anywhere in Manningham. The suburb was largely built out through the postwar decades and the 1960s, well before RCDs were required and long before anyone imagined a car drawing 7kW from a domestic circuit overnight. Original ceramic fuse boards still turn up regularly, and the boards that have been modernised were often done in stages, a breaker here, an RCD there, until there is nothing left for a dedicated charger circuit. That makes the assessment the most important part of the job here. A switchboard upgrade is more likely in Templestowe Lower than in most suburbs we work in, and where one is required, we include it in the quote from the start. No surprises on the day, no second invoice, and every installation comes with a Certificate of Electrical Safety on completion.

For full details on switchboard upgrades, or to learn more about our EV charger installation services across Melbourne's north east, see below.

Ready to Install Your EV Charger in Templestowe Lower?

We assess your switchboard, recommend the right charger for your vehicle and property, and complete the full installation in a single visit. Lifetime workmanship guarantee included.

EV Chargers We Install in Templestowe Lower

These are the chargers we install most often, but we can install any brand or model, including one you already own.

Tesla Wall Connector

Up to 11kW on single-phase. Installed to Tesla's specifications with a dedicated circuit and app integration.

Zappi Solar Charger

The standout choice for solar households. Charges from surplus solar generation rather than drawing from the grid.

Wallbox Pulsar Plus

Compact and reliable. Popular with Kia, Hyundai, MG, Volvo and Polestar owners. App scheduling included.

Evnex

Built for the Australian market. Straightforward home charging with app connectivity and off-peak scheduling.

Universal Type 2 Chargers

Compatible with BYD, Mitsubishi PHEV, Mercedes, BMW, Audi and all other Type 2 vehicles sold in Australia.

Not sure which charger suits your vehicle?
Tell us what you drive and we will give you a straight recommendation.

Mounting and Installation Options

We install wall-mounted and post-mounted chargers across all property types in Templestowe Lower. Cable routing is planned before installation starts and we work to minimise visible conduit where the installation allows.

Most homes here have an attached garage or a carport alongside the house, which usually keeps the run from switchboard to charger short and the installation tidy. Brick veneer construction is the norm across the suburb, so where a wall penetration is needed we core it cleanly and seal it properly rather than running conduit around the perimeter. Single and double garages, carports, external walls and freestanding driveway posts are all setups we handle regularly across Templestowe Lower and the wider Manningham area.

EV Charging and Solar

Solar retrofits are widespread across Templestowe Lower, fitted to homes built decades before rooftop generation was a consideration. Where the array is a decent size and faces north, midday surplus is often more than a car needs, and diverting that surplus into the battery rather than exporting it at a low feed-in rate is where the real saving sits.

A charger such as the Zappi charges your vehicle from surplus solar generation rather than drawing from the grid. We advise on solar integration as part of every quote.

Installation Cost in Templestowe Lower

Most residential installations in Templestowe Lower fall in the range of $850 to $1,900. Shorter cable runs to attached garages keep many jobs here toward the lower end of that range. Where the existing switchboard needs full replacement rather than minor work, that is quoted as a separate line item so you can see exactly what you are paying for. The main variables are:

  • The charger being installed
  • Distance from switchboard to installation point
  • Available electrical capacity
  • Whether a switchboard upgrade is required
  • Single-phase or three-phase supply
  • Cable access and complexity
Call 1300 215 193 for a written quote →

The EV Charger Installation Process

01

Assessment and Quote

We assess your switchboard capacity, available circuits, supply type and cable route and give a straight charger recommendation for your vehicle. You receive a written quote covering all work before anything starts.

02

Installation

The full job is completed in a single visit where the scope allows: charger mounted, cabling run and connected, switchboard connection made, and circuit protection installed. We work neatly and leave the site clean.

03

Testing and Handover

We test the charger through a full cycle, confirm circuit protection is working, and walk you through daily operation and off-peak scheduling. A Certificate of Electrical Safety is issued on completion.

04

Ongoing Support

Our lifetime workmanship guarantee covers the installation. If anything is ever wrong with our work, we come back and fix it. We remain available for questions, faults and follow-up work.

EV Charger Installation Across Manningham and the North East

We install EV chargers regularly across Templestowe Lower and the surrounding Manningham area. The suburbs below are part of our regular run.


Related Services in Templestowe Lower

 

Get a Quote for EV Charger Installation in Templestowe Lower

Tell us about your property and vehicle and we will come out, assess your switchboard and installation options, and provide a written quote with no obligation. Most enquiries hear back from us the same day.

Call 1300 215 193 or send us a message.

Get a Free Quote

Tell us about the job and we will get back to you, usually the same day.
Optional. Photos of the switchboard, fitting or area help us quote accurately.

EV Charger Installation Templestowe Lower: Frequently Asked Questions

How much does EV charger installation cost in Templestowe Lower?

Most residential installations in Templestowe Lower fall between $850 and $1,900. Attached garages and short cable runs keep a lot of jobs here toward the lower end of that range. If your switchboard needs full replacement, that is quoted as a separate line item rather than buried in the installation price, so you can see exactly what you are paying for. You receive a written quote before any work starts, with no variations added later.

Do I need a switchboard upgrade in Templestowe Lower before installing an EV charger?

More often here than almost anywhere else in Manningham. Templestowe Lower was largely built out through the postwar decades and the 1960s, well before RCDs were mandatory, and original ceramic fuse boards still turn up regularly. Boards that have been modernised were frequently done in stages over the years and are now full, with no spare ways for a dedicated charger circuit. We assess your board at no charge as part of every quote and tell you exactly where you stand before any work is booked.

Is Templestowe Lower the same as Templestowe?

No, they are two separate suburbs with different postcodes. Templestowe Lower is 3107, sitting downstream on the Yarra and bounded by Manningham Road to the south, Ruffey Creek and Williamsons Road to the east, and the river to the north. Templestowe is 3106 and sits upstream to the north east. Both are in the City of Manningham and we install EV chargers in both. Many locals still say Lower Templestowe, which refers to the same suburb.

What type of EV charger suits a Templestowe Lower home?

A 7kW Type 2 wall charger is the right choice for almost every home in the suburb. It suits virtually all EVs sold in Australia, runs on standard single-phase supply, and delivers a full overnight charge for most vehicles in 8 to 10 hours. Three-phase supply is rare on Templestowe Lower's postwar and 1960s housing stock, and bringing it in purely to run a 22kW charger rarely pays for itself on a car that sits in the driveway all night. If you have solar, a Zappi is worth a close look.

Is it worth upgrading to three-phase power to get faster charging?

For most Templestowe Lower households, no. A three-phase supply upgrade typically runs into several thousand dollars once the distributor's work, the switchboard rebuild and the mains cable are accounted for, and the only benefit is charging in three to four hours instead of eight to ten. If the car is parked overnight anyway, you are paying a lot to finish charging at 2am rather than 6am. Three-phase makes sense if you already have it, if you are running two EVs, or if you have other heavy loads planned.

Can you install a charger in my attached garage without running conduit around the house?

Usually, yes, and it is one of the advantages of Templestowe Lower's housing stock. Most homes here have an attached garage or a carport alongside the house, so the run from switchboard to charger is short and often internal. Brick veneer is the standard construction across the suburb, so where a wall penetration is needed we core it cleanly and seal it properly. We plan the cable route with you before installation and keep visible conduit to a minimum.

How long does EV charger installation take?

Most residential installations in Templestowe Lower are completed in a single visit of three to five hours, which is at the faster end of the range because the cable runs here are typically short. If your switchboard needs replacing, allow an additional half day and expect the power to be off for part of it. We give you a clear timeframe as part of the quote so you can plan around it.

Can I install an EV charger myself in Victoria?

No. EV charger installation is regulated electrical work in Victoria and must be carried out by a licensed electrician. DIY installation is illegal, voids the charger warranty, may void your home insurance, and creates a genuine safety risk given the sustained load involved. A Certificate of Electrical Safety is required on completion and can only be issued by a licensed electrical contractor.

Do I need council approval to install an EV charger?

For a standard home installation on a detached house, no planning permit is required from Manningham Council. What is required is compliance with AS/NZS 3000 and a Certificate of Electrical Safety, which we issue on completion. Apartment blocks, townhouse developments and heritage overlay properties can have additional requirements, and body corporate approval is usually needed where the charger draws from common property or is mounted on a shared wall.

Can I install an EV charger in a townhouse or unit in Templestowe Lower?

Yes, though it takes more planning. The stretch along Manningham Road and around Macedon Square has seen steady townhouse and unit development, and these properties often have a shared driveway, a garage under the building, or a switchboard in a common area. We work out whose meter the charger draws from, whether load management is needed, and what the body corporate needs to see before approving. Call us and we will talk through your specific setup.

I rent in Templestowe Lower. Can I get a charger installed?

You need your landlord's written consent, since a hardwired charger is a permanent alteration to the property. Some landlords agree readily because a compliant charger and an upgraded switchboard add value to the property. If consent is not forthcoming, a portable charger on an existing 15A outlet is a fallback, though it charges at roughly a third of the speed. We can quote the work for either the tenant or the owner.

Can my EV charger integrate with my solar system?

Yes, if you choose a solar-compatible charger such as the Zappi. Solar retrofits are widespread across Templestowe Lower, fitted to homes built decades before rooftop generation existed, and with feed-in tariffs now well below the price of imported power, diverting midday surplus into the car rather than exporting it is where the real saving sits. The charger monitors your solar output and draws from surplus before touching the grid. We advise on this during the quote process.

Should I charge my EV overnight on an off-peak tariff?

For most Templestowe Lower households without solar, yes. Off-peak rates typically run from around 11pm to 7am and can be less than half the peak rate, which on a 70kWh battery is a meaningful saving on every full charge. Every charger we install supports scheduled charging through its app, so you set the window once and leave it. Solar households often do the reverse and charge midday from surplus generation instead.

Do I even need a wall charger, or is a normal power point enough?

A standard 10A power point delivers around 2.4kW and takes 24 to 30 hours to fill a 70kWh battery. A 7kW wall charger does it in 8 to 10 hours, comfortably overnight. Templestowe Lower sits between the Hurstbridge and Lilydale lines with no station of its own, so most households drive to work or to a station rather than walking to one, and daily distances add up faster than they do in the inner suburbs. A dedicated charger stops being optional fairly quickly.

Should I choose a tethered charger or one with a socket?

A tethered charger has the cable permanently attached, which is more convenient day to day and suits a garage where the cable can hang neatly. An untethered socket unit is tidier to look at, works with any Type 2 cable, and is the better choice where the charger is mounted on an exposed external wall or where two different vehicles use it. Cable lengths on tethered units usually run 5 to 7.5 metres, which matters if you park nose in one day and reverse in the next.

Which EV charger brands do you install in Templestowe Lower?

We install customer-supplied chargers and can supply units directly. Brands we regularly install include Tesla Wall Connector, Zappi, Wallbox Pulsar Plus, Evnex and universal Type 2 chargers. If you have a specific charger in mind, contact us to confirm compatibility with your vehicle and property.

Which EV makes and models do you install chargers for?

We install chargers for all EVs sold in Australia: Tesla Model 3 and Model Y, BYD Atto 3 and Seal, Kia EV6, Hyundai Ioniq 5 and 6, MG ZS EV, Volvo EX40, Polestar 2, Mitsubishi Outlander PHEV, Mercedes EQA and EQC, BMW iX and i4, Audi Q4 e-tron, and others.

What does a compliant EV charger installation include?

A compliant installation includes a dedicated circuit from the switchboard to the charger, correct RCD or RCBO protection in line with AS/NZS 3000, a correct earth connection, weatherproof installation where required, and a Certificate of Electrical Safety on completion. We include all of this as standard, along with a lifetime workmanship guarantee.

Can the charger be installed outside, exposed to weather?

Yes. Every charger we install is rated for outdoor use, typically IP65 or better, and we mount and seal them accordingly. Where a carport or an external wall is the only option, we position the unit clear of downpipes and away from the prevailing weather, and use weatherproof glands at every entry point. Properties on the lower streets near Finns Reserve and the Yarra flats see more damp and morning fog than higher ground, so sealing quality matters more there than most people expect.

Do you need to inspect the property before quoting?

We can give a general indication over the phone, but a written quote requires us to see your switchboard and confirm the cable route. In Templestowe Lower the board is the variable that moves the price most, and its condition is not something anyone can assess accurately over the phone. Call 1300 215 193 to arrange an assessment.

Does an EV charger add value when selling a Templestowe Lower home?

A compliant charger with its Certificate of Electrical Safety is a real selling point, and in Templestowe Lower it often comes bundled with something buyers care about even more: a modern switchboard. Because so many homes here still have original boards, being able to show a buyer that the board has been replaced and the property is EV ready removes two objections at once. A non-compliant or unpermitted install has the opposite effect and can hold up a settlement.

Do you install EV chargers for businesses in Templestowe Lower?

Yes. Macedon Square and Macedon Plaza on Manningham Road anchor the suburb's retail and services, and the medical suites, offices and cafes along that strip are increasingly fitting customer and staff charging. We handle single and multi-bay commercial installations, including load management planning for sites where several vehicles charge at once.

Do you service Bulleen, Doncaster and nearby suburbs?

Yes. We service Templestowe Lower (3107), Templestowe, Bulleen, Doncaster, Doncaster East, Donvale, Warrandyte and Park Orchards across the City of Manningham, along with the Banyule suburbs across the Yarra. If you are unsure whether we cover your location, call 1300 215 193.

Why does Templestowe Lower need a different approach to EV charger installation?

Templestowe Lower is the older, tighter half of the Templestowe pair, built out through the postwar decades on smaller blocks with attached garages and brick veneer construction. That combination cuts both ways for EV work. Cable runs are short and installations are tidy, which keeps costs down, but the switchboards are among the oldest we see anywhere in Manningham, which means the assessment matters more than the charger choice. Anyone quoting this suburb without looking at the board first is guessing.